From EPC D to A — a full building retrofit

Audit, recommendations and re-assessment that moved a commercial asset four bands and cut consumption by 62%.

D → AEPC rating uplift
–62%energy consumption
79,662kWh estimated reduction
£7,716estimated utility saving
375tCO₂e annual carbon saving
Background

Palladium Group, an overseas investor focused on value enhancement of commercial buildings, set an ESG objective of achieving the best possible EPC rating to attract energy-conscious tenants. CSR Sustain was approached by Bloc Building Consultancy, acting on Palladium's behalf.

Client: Palladium Group · via Bloc Building Consultancy  ·  Location: Manchester

What we did
  • Radiators and gas boilers stripped out and replaced with ceiling-concealed fan coil units and a VRF condenser
  • LED lighting retrofit throughout
  • Photovoltaic solar panels installed on the roof
Scope & approach

How the programme ran

CPD workshop

We began with a CPD workshop to help the client understand current regulations for commercial buildings and the best strategy for improving them.

Audit, survey and modelling

Full audit, survey and energy modelling of the property, establishing an initial calculated rating of D.

Recommendations and re-assessment

A recommendations report for Bloc to implement, followed by a revised energy assessment aligned with recent NCM change

Challenges

What made this difficult

01

Inefficient heating

Plant running outside occupancy schedules, with control settings drifting through seasonal change and manual overrides.

02

Split air conditioning

Plant running outside occupancy schedules, with control settings drifting through seasonal change and manual overrides.

03

Ambitious target

Plant running outside occupancy schedules, with control settings drifting through seasonal change and manual overrides.

Results

The outcome

An EPC rating of A was achieved in line with MEES compliance, with a 62% reduction in energy consumption — an estimated 79,662 kWh and £7,716 saved annually, and 375tCO₂e of carbon avoided.

D → AEPC rating uplift
–62%energy consumption
79,662kWh estimated reduction
£7,716estimated utility saving
375tCO₂e annual carbon saving
What we learned

Lessons

Takeaways
  • Education first — a CPD workshop aligned expectations before any survey took place
  • Plant replacement, not fabric, delivered the rating uplift on this asset
  • Re-assessment after works is what converts investment into a certified result

Protect your assets' value — start with a review

A short baseline review shows where your portfolio stands against MEES, where energy and carbon are being lost, and the highest-return actions to take first.

Book a compliance & optimisation review

Delivered with our technology and engineering partners