Elevating energy performance across a 175-building portfolio
Industrial and office portfolio taken from EPC C–G toward a minimum B rating, well ahead of the MEES deadline.
Background
Marchmont, a property portfolio manager, partnered with CSR Sustain to improve energy performance across an extensive portfolio of industrial and office buildings. The objective was MEES compliance — elevating EPC ratings to a minimum of B well ahead of the deadline.
What we did
- Electrification of heating — gas systems replaced with air-source heat pumps in office amenities and localised electric radiant panels in warehouses
- Lighting upgrades — inefficient systems replaced with LED technology throughout
How the programme ran
Portfolio benchmarking
Energy performance benchmarking across 175 buildings initially rated EPC C to G, giving a comprehensive view of efficiency status and highlighting priority assets.
MEES retrofit pathway advice
Bespoke retrofit pathways for 81 buildings, setting out strategies to reach a B rating and addressing both operational inefficiencies and portfolio-specific constraints.
Post-completion certification
Following implementation of upgrade works, 17 buildings were certified as achieving a B rating, meeting MEES compliance and Marchmont's sustainability objectives.
What made this difficult
-
Industrial sites with high heating demand
Warehouses relied on gas convection heaters, with office amenities on gas boilers and radiators — both energy-intensive and inefficient.
-
Cost constraints on fabric upgrades
Insulation and glazing improvements were impractical: high capital cost, minimal impact on EPC rating.
-
Varying building characteristics
No two buildings were alike — differing ages, fabric, business activities and HVAC plant demanded a tailored, cost-effective route to B for each asset.
The outcome
Calculated energy consumption reduction of 3,035,290 kWh (–72%) and carbon reduction of 586,301 kgCO₂ (–83%), with 17 buildings certified at B and further certifications planned as works complete.
Lessons
- Tailored solutions for industrial portfolios — electrifying heating and prioritising lighting proved critical
- Value of early action — starting compliance planning early enabled incremental, cost-effective improvement
- Focus on practicality — avoiding high-cost, low-return upgrades ensured efficient use of capital